Test GKP

100.0 MW Solar Project in Gorakhpur

Project Information
Status
Planning
Capacity
100.00 MW
Location
Gorakhpur
Coordinates
Not available
Data Layers
Geospatial Analysis
Nearby Infrastructure
  • Nearest substation: 25 km
  • Transmission lines: 10 km
  • Nearest urban area: 35 km
Solar Resource
  • Annual avg. GHI: 5.2 kWh/m²
  • Performance ratio:
  • Annual degradation: %
This section displays simulated geospatial analysis results for demonstration. In a production environment, these values would be calculated from actual geographic datasets.