CIAL
50.0 MW Solar Project in kochi
Project Information
Status
Operational
Capacity
50.00 MW
Location
kochi
Coordinates
Not available
Data Layers
Geospatial Analysis
Nearby Infrastructure
- Nearest substation: 25 km
- Transmission lines: 10 km
- Nearest urban area: 35 km
Solar Resource
- Annual avg. GHI: 5.2 kWh/m²
- Performance ratio:
- Annual degradation: %
This section displays simulated geospatial analysis results for demonstration. In a production environment, these values would be calculated from actual geographic datasets.